Saturday, January 31, 2015

Blue Stripe

Masked off a couple of inches under the rub rail for a blue stripe. Put the first coat on last night and the second one this morning. Thought about not worrying about the strips, but I think it looks better with it. Purchased oil based paint by mistake, but it went over the water based white paint ok.








Thursday, January 29, 2015

Seat Back

Put the back on the seat on tonight.


More Progress on the Seats

Nailed and glued the slats on the top of one of the seats. Just the top of the other one to go now, but I think I am about 6 or 7 nails short! The epoxy for the pad eyes is set now, so will drill and screw them in tonight. Then I've got to install the seats (using velcro maybe), get some rope for the rope handles, sand and epoxy the underside of the side decks (there is still a little of bare timber there), glue in the ports and were just about done.





Wednesday, January 28, 2015

Pad Eyes

Drilled the oversize holes for the front and rear pad eyes. Will fill with epoxy and then re-drill before screwing them in.




Monday, January 26, 2015

Seat Construction

Started putting the seats together today. Make up a little jig to ensure all of the nails were lined up and even.





Saturday, January 17, 2015

First Coat on Deck

Put the first coat of varnish on the deck. Far from perfect but it will be ok.




Friday, January 16, 2015

Ready for Deck Varnishing

Drilled the holes for the rope handles and epoxied copper pipe through the holes. Also rounded off the rub rails at the front and rear, and finished sanding the deck ready for varnishing. If the weather is ok tomorrow I'll put on the first coat.





Saturday, January 10, 2015

Varnishing Seat Slats & More Sanding

Put the first coat of varnish on the seat slats, and also started sanded the deck. Still quite a bit more work needed before its ready for varnishing.





Friday, January 9, 2015

Rub Rail #1 Installed

Put on the first of the two rub rails last night. Will install the other one tonight. Almost out of ring nails, so will have to find some more to use on the seats. Cleaned up most of the epoxy run out, but will have to sand it back after its dry to clean it up properly.







Sunday, January 4, 2015

Deck Sanded

Sanded the deck with 80 grit today. Did one side by hand and then tried an orbital sander for the other side. The orbital did a good job with minimal circular marks. Will hand sand with 120 and then 240 next. Also sanded and varnished the other rub rail, as well as varnish the seat slats.

Saturday, January 3, 2015

Seat Slats

Sanded all of the slats for one of the seats today and put the first coat of varnish on them. Still have 22 slats for the other seat to go, and also need to cut some 19x19mm Tas Oak to use for the seat cross pieces. I've also got to cut some Tas Oak to use as the seat rails that will be glued to the bottom of the boat.